The FEIS was accepted by the lead agency, the Town of Cape Vincent Planning Board, on August 18th, 2010.
Findings Statement
Introduction State Environmental Quality Review Process List of Required Permits and Approvals Project Modifications and Supplemental Information Revised Project Layout/Details Environmental Setting, Impact Analysis and Mitigation Measures Water Resources Ecological Resources Noise Shadow Flicker Transmission Line FAA/NTIA Miscellaneous Comment Matrix Table 3-1 Table 3-2 Public Response Summary (Ordered by Subject) Table 4-1 Table 4-2 Table 4-3 Table 4-4 Table 4-5 Table 4-6 Pages 4-72 - 4-101 Pages 4-102 - 4-132 Pages 4-133 - 4-163 Pages 4-163 - 4-192 List of Preparers References Back to top Approximate Area of Vegetation Disturbance Comparison of Conservative Wintertime L90 Background & Turbine Sound Levels Acciona AW 8211500 Sound Power Level Spectrum at 6 m/s U.S. Digital TV Stations Predicted to Serve Project Area Canadian TV Stations Predicted to Serve Project Area Potential Impacts Associated with Roadway Improvement DEIS Comment Matrix SDEIS Comment Matrix DEIS Response Summary Ordered by Subject SDEIS Response Summary Ordered by Subject DEIS Response Summary Ordered by Source SDEIS Response Summary Ordered by Source DEIS Response Summary No Response Necessary SDEIS Response Summary No Response Necessary Back to top Revised Project Layout and Boundary (over USGS topographic map) Revised Project Layout and Boundary (over aerial photo) Turbine Setback Constraints Delineated Wetlands Primary and Secondary Equipment Delivery Routes Private Access Roads Back to top Example of Acciona-built O&M Building at EcoGrove Wind Farm, IL Met Tower Guy Wire Bird Deflector Wetland Mitigation Location Proposed Grassland Bird Conservation Easement Noise Modeling Results -Predicted Mean Sound Contours 42 dBA Threshold Noise Modeling Results -Predicted Sound Contours 44 dBA Threshold Noise Modeling Results -Cumulative Impact from Neighboring Windfarm Plan View of Proposed Lyme Substation Facility Profile View of Proposed Lyme Substation Facility Maximum Magnetic Field of 5.73 (mG) found at Station 30184 offset -5.00 feet Maximum Magnetic Field of 1.142 (kV/m)found at Station 30184 offset -5.00 feet Population Density Associated with Operational Wind Energy Facilities in New York Appendix A – Correspondence New York State Department of Environmental Conservation New York State Department of Agriculture and Markets Town of Cape Vincent Planning Board New York State Historic Preservation Office U.S. Department of Commerce, National Telecommunication and Information Administration (NTIA) Federal Aviation Administration Correspondence to BP Alternative Energy Appendix B - Public Notices Acceptance of SDEIS Notice of Public Hearing Appendix C - Additional Studies/Plans Supplemental Wetland Delineation Information Wetland Compensatory Mitigation Plan 2009 Pre-Construction Grassland and Sensitive Bird Species Study Biological Assessment Final Noise Modeling Assessment Transportation Route Evaluation Study Residential Well Study and Mitigation Plan Transmission Line Engineering Concept Report Draft Storm Water Pollution Prevention Plan (SWPPP) for the St. Lawrence Windpower Project Unanticipated Discoveries Plan Final Shadow Flicker Analysis Revised Complaint Resolution Plan Draft Spill Prevention, Control, and Countermeasure (SPCC) Plan Wildlife Protection Plan (WPP) Draft Outline of Construction Environmental Monitoring Plan FAA Final Lighting Plan Final Off-Air TV Station Assessment NYS Office of Parks, Recreation and Historic Preservation Park Attendance Ledgers Appendix D – Public Hearing Transcripts DEIS Public Hearing SDEIS Public Hearing Appendix E - Written Comments DEIS Comments SDEIS Comments Back to top
Introduction
Project Modifications and Supplemental Information
Pages 4-72 - 4-101
Back to top